Similar Posts
Notice of Construction on East Hill Road
Beginning on 3 June and ending no later than 20 June, the Brookfield Highway Dept will be replacing culverts and doing ditch work on East Hill Road in Brookfield. The crew will do their best to keep traffic moving but please be advised, that this road maintenance will inevitably lead to delays and temporary road…
Historic Floating Bridge Document
Here at the Town Office we have been trying to improve the filing system. I was looking through a folder full of information regarding the Floating Bridge and I found a copy of the original application for the inclusion of the Bridge in the National Register of Historic Places. Inclusion in the Register was a…
Household Hazardous Waste Day 18 April 2020
Saturday, April 18, 2020 From 8:00 a.m. to 1:00 p.m. At the Closed Landfill past the Randolph Transfer Station This event is for the residents of: Randolph, Braintree, Brookfield & Northfield Materials Accepted at the Event: Acids, Adhesives, Aerosols, Antifreeze, Brake Fluid, Cements, Charcoal Lighters, Chlorine, Cleaning Fluid, Degreasers, Disinfectants, Drain Cleaners, Dry Gas, Epoxies,…
Depositing Snow on Public Roads
Public Notice Town of Brookfield Snow Plowing Onto Roadways: To all private snow plow contractors and residents of Brookfield, please be advised that depositing by blowing or plowing onto the traveled way or shoulder of a class 1, 2 or 3 town highway violates Vermont Statute Title 19, Section 1105 and Title 23, Section 1126a….