Addendum 3
Brookfield Town Garage building
October 11, 2022
- Permits – The Town believes that it has obtained the State and Local permits required for the project. The Town will verify if a permit is required for the floor drains and if so obtain this permit over the winter.
- As noted previously, the Town may require a performance or payment bond as an element of the contract. If required these would be an addition at cost and are not to be included in the Bid price.
- Vapor barrier, where required shall be standard construction material designed for such purpose.
- The power to the old well has been disconnected in the existing garage building (contractor to verify before preforming and excavation on the site). The water line and power line to the old well have not been removed and are to be reconnected in the new building to service the hose bibs.