Similar Posts
Verizon Wireless Letter to Planning Commission, Ridge Road Facility
For the information of Brookfield residents, this post links to a letter and attachments received from Verizon Wireless on August 27, 2015. Verizon Wireless Letter 8-26-15
Brookfield Highway Department Materials Policy
The Town of Brookfield would like to remind residents that all materials stock piled on the garage property are for Highway Department use only. The only exception is the limited use of sand for resident driveways during the winter. The Town’s policy regarding use of the Town’s sand supply for private driveways is as follows:…
Route 66 Construction
A friendly reminder: Pike and J. Hutchins will continue drainage work next week along Route 66 east of the Randolph Village / VTC area toward VT 14. There will be new pavement placed over culvert crossings that are installed. There was a slight change in schedule, and the shim leveling course (layer of pavement) work…
Household Hazardous Waste Day
Saturday, October 10, 2015 From 8:00 am to 1:00 pm LOCATION CHANGE: Behind the Northfield Fire Station at 128 Wall Street, Northfield, Vermont This event is for the residents of: Randolph, Brookfield, Braintree and Northfield ONLY! Click here: Randolph HHWD Registration Form-October 10 2015 for a flyer with more information and the required form…
OSSD Annual School Meeting Warning 2019
The annual meeting will be held on Monday, March 4, 2019 at the Murray Auditorium at the Randolph Union High School at 6:00 p.m. Please go to this link for more information: OSSD Annual Meeting Warning 2019